Jueligad Small Hydropower Project (996 KW)
Client : Rangun Khola Hydropower (P.) Ltd.
Service rendered : Due Diligence study for the Client on behalf of Machhapuchchhre Bank
Job status: completed
The scheme is Run-off-river project and located in Bajhan district. The scheme utilizes design discharge of 1.50 m3/s and topographical head of 91 m.
Miya Khola Small Hydropower Project (996 KW)
Client : Sapsup Kalika Hydropower (P.) Ltd
Service rendered : tender document preparation and detailed engineering design of civil works
Job status: Complete
Project status : Under Operation
The scheme is located in Khotang district on Miya Khola. The scheme utilizes design discharge of 0.70 m3/s and topographical head of 217.20 m.
Upper Chaku – A Hydroelectric Project (22.2 MW)
Client : Shiva Shree Hydropower (P.) Ltd.
Service rendered : detailed engineering design of the headworks components
Job Status: completed
Project Status: Under construction
This scheme is located in Sindhupalchowk district on Chaku Khola. The scheme utilizes design discharge of 3.25 m3/s and topographical head of 820 m.
◄